The takeoff checklist for subcontractors
What to check before a number leaves the office — for drywall and interiors, concrete and wood framing. Most misses are not counting mistakes: they sit in a note, a detail, a schedule or an addendum instead of the plan.
27 checks · drywall and interiors, concrete, wood framing · free by email
What's in it
Every item below, with what to check for each, as a printable PDF. It is a list of what to look for: member sizes, sections and reinforcing always come from the drawings and the engineer.
The drawing set
- 1.Every sheet on the index is in hand
- 2.Every addendum is read, in order
- 3.The general notes and specifications are read
- 4.The scale is checked on every sheet
- 5.Heights come from sections and ceiling plans
Drywall and interiors
- 6.Partition types to deck versus to ceiling
- 7.Backing and blocking
- 8.Openings: frames, headers and jambs
- 9.Trims, bead and control joints
- 10.Bulkheads, soffits and ceiling clouds
- 11.Fire-rated and acoustic assemblies
- 12.Level of finish and paint coats
Concrete
- 13.Every footing mark matches a schedule row
- 14.Step footings, keyways and dowels
- 15.Slab thickenings, drops and edges
- 16.Rebar laps, chairs and accessories
- 17.Who carries pumping, heating, testing and finishing
Wood framing
- 18.Every size comes from the drawings
- 19.Headers and lintels at every opening
- 20.Blocking, bridging, hangers and hardware
- 21.Sheathing overhangs, gables and waste
- 22.What the truss quote includes
Before the bid goes out
- 23.Waste allowances are stated
- 24.Scope boundaries between trades
- 25.Exclusions and clarifications are written
- 26.The bid form is complete
- 27.A second look at the big lines
The guides go deeper: partition schedules, footing schedules, addenda and what goes missing on a drywall takeoff.