Guide

How to read a partition schedule for a drywall takeoff

What a partition type tells an estimator — studs, gauge and spacing, board layers, insulation, height, fire rating and sound rating — and how each line becomes studs, track, board and batts.

Updated September 16, 2026 · Written for estimators in Ontario and across Canada

On an interior set, the floor plans tag every wall with a partition type — a mark like P1, 3A or W-4 in a small symbol on the wall. The partition schedule (or legend, or wall types sheet) says what each mark means. It is usually on an A-500 or A-600 series sheet, sometimes on the first floor plan. A drywall takeoff is the length of each type off the plans, multiplied out by what the schedule says.

What a partition type says

A typical commercial schedule looks something like this:

TypeFramingBoardInsulationHeightRating
P192 mm (3⅝") steel stud @ 400 (16") o.c.1 layer 16 mm (⅝") Type X each sideTo underside of ceiling + 150
P292 mm steel stud @ 400 o.c.1 layer 16 mm Type X each sideAcoustic batt, full heightTo deckSTC 45
P3152 mm (6") steel stud @ 400 o.c.2 layers 16 mm Type X each sideAcoustic battTo deck, deflection track1 hr, listed design

Read every type for the same five things:

  1. Framing — stud depth, gauge (thickness) and spacing. Spacing is a maximum and depth a minimum in most listed designs.
  2. Board — how many layers on each side, the thickness, and the kind: regular, Type X, moisture-resistant, abuse-resistant, shaft liner. One side can differ from the other.
  3. Insulation — acoustic or thermal batts, and whether they run full height.
  4. Height — to the ceiling, a set distance above it, or to the deck (underside of the structure). Walls to the deck often need a deflection head track.
  5. Rating — a fire-resistance rating with a listed design number (ULC or UL), and a sound rating (STC). Ratings bring sealant, firestopping and head-of-wall details with them.

Turning a type into material

Measure the length of each type on the plans. For every type, per linear foot:

  • StudsLF × 12 ÷ spacing + 1 per run, plus the jambs and cripples at openings and a stud at each corner or tee. The metal stud calculator does this.
  • Track — top and bottom, LF × 2, or deflection track at the head where the type calls for it.
  • BoardLF × height × layers for each side, less openings. Two layers each side is four times the wall area in board.
  • InsulationLF × height, less openings, in the batt the type names.
  • Finishing — tape and compound on the exposed face only; the inner layer of a two-layer wall is usually fastened, not finished.

Height matters as much as length. A type “to deck” on a floor with a 4.2 m (14 ft) structure takes more than half as much board again as one at 2.7 m (9 ft) — read the building sections and reflected ceiling plans, not just the schedule.

Where schedules trip estimators

  • Types that change mid-run — a corridor wall that becomes rated at a stair, or a wall that goes to deck only above a door.
  • Notes that apply to every type — “all partitions at washrooms to be moisture-resistant board” lives in the general notes, not the schedule.
  • Furring and shaft walls — often shown as their own types with one side only.
  • Unmarked walls — the notes usually say what an untagged wall is. If they don't, ask before bid close.
  • Addenda — a revised schedule changes every wall with that mark. See how to read an addendum.

Doing it on the drawings

PreConstruct AI reads the partition legend's text — P1, P2, P3 and what each line says — and turns each into a wall type carrying your own rates, which you check before using. You click along the walls on the plan, pick the type, and it lists studs, track, board, insulation, tape and compound with the arithmetic beside each. It reads text: a legend drawn only as pictures gives nothing, and the assembly is always the drawings' to decide.

Free PDF

The takeoff checklist for subcontractors

What to check on the drawing set, drywall and interiors, concrete, wood framing and the bid itself — as a printable PDF. See what's in it.

Your email is used to send you the checklist and nothing else unless you tick the box above. Unsubscribe any time.

Sources

Code tables and published figures change. Check the current Ontario Building Code, your drawings and your engineer before you rely on any number here.