What Hamilton's 2025 permits were for
Invest in Hamilton puts the City's 2025 building permit construction value at an estimated $2.30 billion, second only to 2023, at $2.55 billion.
The Public Record reported $1.016 billion of permit value from January to April 2025, “the best start to a year in Hamilton's history”, and called March, at $407.8 million, the third-highest month for permits in 15 years.
By 8 October 2025 the City had passed $2 billion, five days earlier than the previous record of 13 October 2023, according to the Hamilton Independent. Residential work was about three quarters of the value issued by then. Industrial and commercial was about a sixth. Invest in Hamilton gives the industrial and commercial figure for 2025 to date as $368,237,080.
Some of the larger 2025 permits on The Public Record's list:
- A McMaster student residence at 1190 Main St W, $146.1 million (Lincoln Alexander Hall, 567 units, in the Hamilton Independent).
- Long-term care at 466 Highway 8, $80 million (Pine Villa, in the Hamilton Independent).
- Two Victoria Park Community Homes buildings on Caledon Ave: $35.5 million for 114 units and $30.4 million for 87.
- Warehouses in Flamborough at 22 Medicorum Pl ($52.7 million) and 8 Dobbin Dr ($15 million).
- Emblem Developments, $65 million for the next phase of its 41 Wilson Street project.
For a drywall sub, a residence and a long-term care home are rooms repeated off corridors. The partition types around each suite and the doors carry most of that bid. A warehouse is usually a concrete package, with interiors in the office area. The permit lists do not say how any of these buildings is framed; the structural sheets do.
The concrete towers in Beasley and Durand
Design District, by Emblem Developments with Arcadis as architect, sits at the northeast corner of Wilson St and Hughson St N in Beasley. It is three 31-storey towers with 931 condo units. Ground was broken in August 2023. On 8 June 2026 UrbanToronto reported towers 1 and 2 substantially complete, and the first floor of tower 3 rising above the finished podium.
UrbanToronto describes the structure as reinforced concrete columns, shear walls and floor slabs. That is formwork and placing on every level for a concrete sub.
Television City is at 163 Jackson St W in Durand, by Lamb Development Corp with architects-Alliance. UrbanToronto describes two 32-storey towers of 110.14 m over a five-level underground garage. Its 11 February 2026 update shows the west tower at six storeys, with the east tower a floor behind. The Public Record reported its primary building permit, issued in March 2025, at $210 million for the two towers combined.
Reading a tower set
In a tower set the typical floors repeat, and the quantities that go missing sit on the levels that do not: the below-grade levels, the podium, any transfer level, the amenity floor and the mechanical penthouse. Take those off sheet by sheet, and count the typical floors from the sections, not from the sheet index.
The LRT is in design, and the work so far is civil
A Government of Canada release of 30 April 2026 describes the LRT as 14 km with 17 stops. The places it names on the line include McMaster University, downtown, Hamilton Stadium, Ottawa Street, Gage Park and Eastgate Square. Canada is putting in up to $1.7 billion, and Ontario leads construction through Metrolinx.
The Hamilton Transit Alliance, led by Aecon, holds the first civil and utility contract. It will carry detailed design and planning forward over the next two years. The preparatory work the release lists is utility relocations, bridges, sidewalks and traffic control systems.
That is civil work under a contract already awarded. The release says nothing about stations or buildings with interior packages, or about how subcontract work will be let.
Bidding City of Hamilton work
The City posts its public tenders, bids and requests for proposals on hamilton.bidsandtenders.ca. You register a Bidding System Vendor account and pick commodity codes, and the site emails you notices for those codes.
The portal also names a Vendor Performance Management Program, launched 10 June 2025. Read its terms before you bid.
Council approved an updated Fair Wage Policy and Schedule on 7 May 2026, and the changes took effect on 14 July 2026. The portal says the policy applies where a construction contract award is $500,000 or more.
Before you carry labour rates
If the job you are pricing sits inside a City construction contract of $500,000 or more, read the Fair Wage Schedule for your trade first. The portal page does not say how the policy reaches subcontractors, so ask the general contractor or the City which rates apply to you.
Noise By-law 11-285 and exemption permits
The City's property use by-laws page, modified 3 September 2026, points to Noise Control By-law 11-285. It says work outside the by-law's permitted times needs a Noise Exemption Permit application, with a $280 fee.
That page gives the permitted times for construction work as 7 am to 10 pm. Read By-law 11-285 itself before you plan an early pour or a late board delivery. If the schedule you are pricing needs work outside the by-law's hours, carry the exemption permit in the bid rather than finding out on site.
Green Building Standards: endorsed, waiting on an implementation plan
Council endorsed Hamilton's Green Building Standards on 9 October 2024, and Planning Committee endorsed updates on 29 April 2025. Engage Hamilton says they will not take effect until an implementation plan is approved. On 30 April 2025 the General Issues Committee sent that plan back to staff for costing, with reports due back to Council late in 2025.
That page was last updated on 9 June 2025 and shows no later status. When the standards do apply, they cover site plan and plan of subdivision applications in the Urban Area: low-density residential of more than 10 units, mid- and high-rise residential, as well as commercial, industrial and institutional buildings.
For a takeoff, nothing changes until they are in force. Because they would work through site plan and subdivision applications, any change will show in a project's own drawings and specification.
What PreConstruct AI does with a Hamilton drawing set
You upload the PDF set you are bidding and choose the trades you bid (interior finishes, concrete and wood framing). Every sheet is read for every trade, and you see only what you bid.
- It reads the text on the drawings: partition legends and schedules (these become wall types you approve), door and window schedules, ceiling legends and footing schedules. It does not count symbols.
- Wall suggestions miss walls and mark things that are not walls, so you check and confirm each one, or draw them.
- Every quantity read from the drawings shows its sheet and its arithmetic, in imperial, metric or both.
- An addendum is charged only for its changed and added sheets, at one bid per 75 sheets. Compare drawings lays the old and new sheets over each other: red for what was taken out, blue for what was put in. It compares ink, so a drawing that moved on the sheet shows as changed.
- It never sizes a member and never suggests a tax rate. Sizes come from the drawings and the engineer, and you type the tax rate on every job.
PreConstruct AI