Industrial is where Vaughan ranks nationally
Vaughan issued nearly 2,300 building permits in 2024, with a construction value of $1.89 billion, according to Vaughan Economic Development, which reports the City's own summary of construction activity. More than $1.1 billion of that was non-residential, and industrial alone was more than $815.5 million.
By number of industrial permits, Vaughan ranked third in Canada in the fourth quarter of 2025 and again in the second quarter of 2026 (sixth by value), on Statistics Canada data. Through the second quarter of 2026, the value of industrial permits in the city passed $235 million.
Woodbridge's tower proposals, and the towers rising in the VMC
Woodbridge is a community in Vaughan, part of it since 1971, when the new Town of Vaughan was formed. Its older industrial land runs along Steeles Avenue east of the Humber. A second industrial area west of Highway 27 began developing in the 2000s and is still growing, and the Highway 427 extension, opened in 2021, has added to it.
Two of the large residential proposals in Woodbridge, both on Weston Road, were moving through the planning process in UrbanToronto's 2025 reports:
- Woodbridge Square, 7600 Weston Road: nine towers of 12 to 57 storeys with 4,388 condominium units. Official Plan and Zoning By-law Amendment applications had been filed (UrbanToronto, 30 July 2025).
- 7887 Weston Road: four towers of 36 to 49 storeys on six-storey podiums, with 2,339 units. The Ontario Land Tribunal approved it in principle in an interim decision in March 2025, after City Council had recommended refusal in October 2024. It is planned in two phases, the southern block first (UrbanToronto, 2 May 2025).
Between them the two Weston Road sites propose 6,727 units.
Towers under construction in 2026 include two projects in the Vaughan Metropolitan Centre. At ArtWalk Phase 1, a concrete structure, the 38-storey tower stood at 13 storeys with cladding underway (UrbanToronto, 21 August 2026); three tower cranes were serving the site in April 2026. Encore at Bravo, three towers of 36, 41 and 45 storeys, broke ground in May 2024, with its 36-storey east tower to rise first. Next to them, the four Festival towers, 41 to 59 storeys, stood fully clad by April 2026, with the work around them on the courtyard and low-rise pavilions.
What a Vaughan fit-out permit set has to show
For industrial, commercial and institutional (ICI) buildings, the City says many interior alterations are subject to site plan control. A site plan letter of undertaking or agreement has to be approved and in place before the permit application goes in. On a tenant fit-out, that step can sit between the drawings you are bidding and the permit.
The permit set itself is a PDF of the construction drawings, and the City asks for:
- a scale of at least 1:75 or 3/16" = 1'-0", fully dimensioned, signed and dated;
- notes giving the interior finishes of the walls, ceilings and floors, with room sizes and uses;
- the existing and proposed fire separations, and any other rated assemblies;
- on an alteration, the existing building shown apart from the new work;
- an architect's or engineer's seal, or the designer's BCIN when neither prepared the drawings.
A Vaughan fit-out set that went to permit should already say which finish goes where and which partitions are rated. If the set you were sent has no finish notes or no rated assembly marks, it may be an earlier issue than the permit set, and that is worth an RFI before you price the rated walls.
The rule on existing and new work matters for the same reason. Retained partitions should read differently from new ones on the plan, so you can keep them out of your new wall lengths and price the demolition separately.
Check the scale first
Vaughan wants these drawings at 1:75 or larger. Before you measure from the PDF, check the stated scale against a written dimension on the sheet. A set printed to fit a smaller page will not measure at its stated scale.
Who applies, and the by-laws behind the permit
Applications go through the Building Standards Department's Building Portal, which the City also calls the ePlans Portal. In the City's words, the legal applicant for a building permit is the registered user of the online portal who submits the application. If your company files the permit on a small fit-out, decide which person in the office holds that account.
Building By-law 168-2024 took effect on 1 January 2025, and the permit fees come from By-law 051-2026, in effect since 24 February 2026. If you carry a permit allowance in a price, take it from the 2026 fee by-law.
City of Vaughan bids: bids&tenders and the OHSMS rule
The City posts its public quotes, tenders, pre-qualifications and requests for proposals on bids&tenders. Once you have an account you can preview bid documents at no charge, and you register as a plan taker on each opportunity you want. Some opportunities carry a document fee, paid before you are registered.
To be awarded a City project valued at more than $500,000, a contractor must be certified with an approved occupational health and safety management system (OHSMS). The portal lists it as Phase 4, in force from 1 September 2023. If you are pricing under a general contractor, read the bid documents to see whether the requirement reaches the trades.
Construction noise hours and the exemption
Vaughan's Noise Control By-law 121-2021 permits construction noise from 7 a.m. to 7 p.m., Monday to Saturday, excluding statutory holidays. Before any exemption, noisy work fits in a six-day week of 12-hour days.
Noisy work outside those hours needs a Construction Noise Exemption Application, submitted at least 90 days before the start date. The application fee is $449 in 2026 and $463 in 2027. Penalties under the by-law range from $200 to $100,000.
A large pour that could run past 7 p.m. has to be planned at least 90 days out. If the schedule in the bid documents assumes extended hours, ask who applies for the exemption and whether its fee sits in the general contractor's scope or yours.
What PreConstruct AI does with a Vaughan drawing set
You upload the PDF set you are bidding and choose the trades you bid (interior finishes, concrete and wood framing). Every sheet is read for every trade, and you see only what you bid.
- It reads the text on the drawings: partition legends and schedules (these become wall types you approve), door and window schedules, ceiling legends and footing schedules. It does not count symbols.
- Wall suggestions miss walls and mark things that are not walls, so you check and confirm each one, or draw them.
- Every quantity read from the drawings shows its sheet and its arithmetic, in imperial, metric or both.
- An addendum is charged only for its changed and added sheets, at one bid per 75 sheets. Compare drawings lays the old and new sheets over each other: red for what was taken out, blue for what was put in. It compares ink, so a drawing that moved on the sheet shows as changed.
- It never sizes a member and never suggests a tax rate. Sizes come from the drawings and the engineer, and you type the tax rate on every job.
PreConstruct AI