Toronto takeoff software for drywall, concrete and framing

Toronto wants permit PDFs at the paper drawings' scale and revised drawings as changed pages only. What that means for a bid, plus 2026's work and noise.

Facts read on their sources November 16, 2026 · Written for estimators at interior finishes, concrete and wood framing subcontractors

$7.36B

ICI building permits in the Toronto CMA, Q2 2026, nearly double Q1

Ontario Construction Secretariat ICI bulletin, 18 Aug 2026

0

New condo projects launched across the GTHA in Q1 2026

CP24 (Urbanation data), 17 Apr 2026

ARCH E

Largest page Toronto Building accepts in a permit PDF (36 x 48 in)

City of Toronto: Electronic submission guidelines

$900

Ticket for construction noise outside the permitted hours

City of Toronto: Noise bylaw

Try this on your own drawings. Upload a set and your first bid is free. No card, no demo call.

What is being built in Toronto in 2026

The mix of work changed this year. The Ontario Construction Secretariat's bulletin of 18 August 2026 put industrial, commercial and institutional (ICI) permits in the Toronto census metropolitan area (CMA) at $7.36 billion for the second quarter, nearly double the first. The CMA is the wider metro area, and the bulletin does not give the City of Toronto on its own. It ties most of June's jump to one major medical project.

New condos went the other way. Urbanation's figures, reported by CP24 on 17 April 2026, showed 246 new condo units sold across the GTHA in the first couple of months of the year. First-quarter sales were at a 35-year low, and no new project launched.

Third-quarter sales rose to 760 units, but 648 of them were in completed buildings and only 60 were pre-construction (CP24, 21 October 2026). The same report put construction starts at historic lows. Fewer pre-construction sales now point to fewer condo towers to form and board in the next few years.

Transit work carries on. The Ontario Line is a 15.6 km subway with 15 stops from Exhibition Place to Eglinton and Don Mills. CP24 reported on 16 April 2026 that two tunnel boring machines were about to start the twin tunnels, about 6 km each from near Exhibition Station to just west of the lower Don River, with the estimate at $29.5 billion and opening targeted for the early 2030s.

The longer view is the City's Development Pipeline. From 2021 to 2025, 791,045 residential units and 8,904,296 m² of non-residential floor area were proposed. About five in six of those homes and nine in ten square metres of that floor area are in Growth Areas.

In early 2025, Ontario Construction News reported the City's monthly permits with the largest jobs named. January 2025 brought $1.13 billion across 3,332 projects, led by two permits worth $173.8 million for an affordable apartment complex at 571 Dundas Street West. December 2024 included the 26-storey Daniels on Parliament, the last building of Regent Park Phase 3.

How Toronto Building wants permit drawings

The Municipal Code (Chapter 363-3.5) requires permit applications to be submitted electronically, so a Toronto permit set is a PDF. The City's electronic submission guidelines, last changed on 11 September 2026, set out what that PDF has to be:

  • Its scale and page size match the full-size paper drawings.
  • No page is larger than ARCH E, 36 x 48 in (914.4 x 1219.2 mm).
  • One layer, with no comments, unsecured and without a password, saved as PDF version 7 or later.
  • Drawings and specifications in black and white. Colour renderings and photos are allowed only as supplements.
  • Scans at 1-bit, 300 dpi are usually accepted. Fine detail needs 600 dpi.

The guidelines say applications go to Toronto Building by email, though the City says not every project is eligible for email submission. Resubmissions go online, or by SFTP when a file is over 2 GB, and the City will not take resubmitted drawings on a USB stick.

For takeoff, the first rule is the useful one. A set prepared to it keeps its printed scale in the PDF, so a 1:100 floor plan still measures at 1:100 when the page is taken at full size. That holds for the set filed with the City. The set a GC sends you to price may have been exported another way, so check a known dimension on each sheet before you measure from it.

No colour to lean on

A permit set in black and white tells wall types apart by hatching, line weight and tags. Read the partition legend and the wall tags before you measure anything.

Revisions: only the pages that changed

Plan review in Toronto runs in order: zoning, then the Building Code, then mechanical plans where they apply, then fire prevention for certain multi-family and ICI applications with fire protection systems. Revised drawings go in through the File Submission Hub in Toronto Building Online Services.

The City's plan review page, updated 14 October 2026, says only the revised pages are required, with revision bubbles marking the changes. It takes one drawing submission at a time, and no more can be uploaded until the examiner accepts it. Files are limited to 2 GB.

That is a permit rule. Whether revisions reach you as a full reissue or as a few clouded sheets depends on the architect and the GC. When they come as changed pages only, the bubbles tell you where to look. Whoever revised the sheet drew them, though, and a bubble can miss a change, so lay the old sheet over the new one before you reprice.

What an interior alteration permit set has to show

Toronto's guide for non-residential interior alterations, modified 13 February 2026, lists what the drawings must include. Most of it is what a drywall and ceilings estimator prices from:

  • Dimensioned floor plans for each level, with the existing and proposed use of every space.
  • Plumbing fixtures and the reflected ceiling, with their details.
  • Interior and exterior wall assemblies, fire separations and the structural framing above.
  • Cross sections with the floor, wall and roof assemblies, and the fire separations detailed.
  • Door and room finish schedules.

Sheets must be standard sizes, drawn to scale, fully dimensioned, signed and dated, and every drawing goes in as a PDF. Since 16 February 2026 every application needs the City's updated application form.

A fit-out set that has been through permit should carry partition types, rated walls and a reflected ceiling plan. If the set you were sent is missing one of them, ask for it in an RFI before you price around the gap.

Where Toronto's public work is tendered

City of Toronto contracts are advertised on the Toronto Bids Portal (TO Bids). It lists upcoming, active, pending and awarded solicitations, and you can subscribe to notifications about new competitive awards.

Bids themselves go through the SAP Business Network, where the City says suppliers can download solicitation documents free. A company that has not registered with the City before does so through its Supplier Registration Form first.

The TTC posts its solicitations, results and awards on MERX, where it asks suppliers to register.

Noise hours and your schedule

Toronto's noise bylaw prohibits clearly audible construction noise at these times:

  • Monday to Friday, 7 p.m. to 7 a.m.
  • Saturday, 12:01 a.m. to 9 a.m. and 7 p.m. to midnight.
  • Sundays and statutory holidays, all day.

The ticket fine under section 591-2.3 is $900. If the City issues a summons to court instead, a conviction can bring a fine of up to $100,000, or up to $10,000 for each day the violation continues.

Saturday is the day that catches a schedule out. Noisy work runs from 9 a.m. to 7 p.m., two hours shorter than a weekday that starts at 7. Cutting studs and shooting track are hard to keep quiet. If the GC's schedule leans on Saturdays to make a date, price the shorter day, and plan no noisy work on Sundays.

What PreConstruct AI does with a Toronto drawing set

You upload the PDF set you are bidding and choose the trades you bid (interior finishes, concrete and wood framing). Every sheet is read for every trade, and you see only what you bid.

  • It reads the text on the drawings: partition legends and schedules (these become wall types you approve), door and window schedules, ceiling legends and footing schedules. It does not count symbols.
  • Wall suggestions miss walls and mark things that are not walls, so you check and confirm each one, or draw them.
  • Every quantity read from the drawings shows its sheet and its arithmetic, in imperial, metric or both.
  • An addendum is charged only for its changed and added sheets, at one bid per 75 sheets. Compare drawings lays the old and new sheets over each other: red for what was taken out, blue for what was put in. It compares ink, so a drawing that moved on the sheet shows as changed.
  • It never sizes a member and never suggests a tax rate. Sizes come from the drawings and the engineer, and you type the tax rate on every job.

Sources

Read on November 16, 2026. Bylaws, fees and portals change: check the city's own page before you rely on any of it.